The Bonython Jubilee building is 3 level school facility that houses the human anatomy faculty and contains 2 main libraries and resource rooms: Materials For Building Renovation Assignment, UOS, Australia
University | University of South Australia (UOS) |
Subject | Materials For Building Renovation |
The Bonython Jubilee building is 3 level school facility that houses the human anatomy faculty and contains 2 main libraries and resource rooms. The installation requires renovation and refurbishment of its doors. In effect, we will carry out an examination of a new alternative method to the traditional conventional renovation process. The doors in the building are used as access points to and through the interior of the buildings and the separation of rooms for safety, privacy, and convenience. The building does not house highly sensitive materials and hence most of the doors are either wooden or timber. Unfortunately, the doors have been subject to damage over the past few years, hence requiring renovation.
Are You Searching Answer of this Question? Request Australian Writers to Write a plagiarism Free Copy for You.
Wooden doors are usually subject to various hazards including damaged masonry, wood suffering from dry rot as well as termite damage. These factors add up to less security a bad aesthetic and regular repair costs which eventually result in a hefty overall bill. In addition, these simple repairs do not address core issues such as the root cause of the damage and reducing susceptibility to the presenting damage. For our purpose, we shall apply restoration and replacement as opposed to traditional repairs.
Restoration and replacement take into consideration the overall damage and possible risk factors that may subject the door to damage. In effect elements such as termite damage are handled whereas standard repairs or simple replacement would not get rid of the termites but rather afford them newer wood to damage. Additionally, repairs may overlook elements such as wood rotting and paint dilution which may open the door to harm. An overall restoration and replacement process costs less than actual replacement since it reduces the downtime that may result during the repair process. In effect, this presents a one-time solution that keeps the contractor away.
Get Solution of this Assessment. Hire Experts to solve this assignment for you Before Deadline.
Recent Solved Questions
- CPCCBC4004A: To complete this task, you are required to submit a price for the contractual obligations of Mr. and Mrs. Brown’s construction project: Identify and produce estimated costs for building and construction projects Assessment, VU, Australia
- A20814: Identify transactions required to be included in the journal entries and Identify general ledger accounts: Finance in Business Assignment, APC, Australia
- SITXMGT002: Explain The Following Institutions With Whom Businesses May Seek: Establish And Conduct Business Relationships Assignment, UWA, Australia
- PUBH6034: Look up the Ten characteristics of a Servant Leader for practitioners in the chapter: Leadership and new public health Essay, CU, Australia
- LAW512 Research Paper- University of Australia
- BAA752: Prepare a report, explaining the value proposition of a Collaborative Partnership that the Project Would require Between Your Organisation: Foundations of Integrated Care Report,
- CHP203: The Food Standards Australia New Zealand (FSANZ) confirmed that acrylamide is a carcinogenic substance and that current levels of dietary exposure: Chemistry for the Health Professions Assignment, TUA, Australia
- HC1052: Strengths-Based Development Identify any business of your interest and imagine that you are the management team: Organisational Behaviour Report, Australia
- HI5015 Legal Aspects of International Trade and Enterprise
- FNSACC514: How Is The Report Disseminated And Who Is It Given To: Prepare Financial Reports For Corporate Entities Assignment, SU, Australia