We Are Pleased To Provide A Report On Our Investigations Undertaken: Initial Planning Case Study, UQ, Australia

University UQ
Subject Initial Planning

1. INTRODUCTION

We are pleased to provide a report on our investigations undertaken at the above site to determine the ground conditions so that recommendations could be made on suitable foundation types and design parameters for the proposed Commercial development.

This report outlines footing recommendations to satisfy AS3600 in accordance with the National Construction Code Series Volumes One and Two – Building Code of Australia.

2. FIELDWORK

6 Boreholes were drilled at Lot. The Engineering Logs are attached as part of this report. The location of the boreholes placed is described on the Borehole Location Plan provided.

3. WIND SPEED ANALYSIS

During our investigation, an assessment of this site and the surrounding terrain was carried out to determine the Wind Classification Design Speed. Based on calculations using the Pro-forma Design Sheet, DC1.2 as a guide, the Wind Classification Design Speed for this site has been determined as 33m/s (N2).

4. BUSHFIRE ATTACK LEVEL

This property is not in a designated Bushfire Prone area.

5. SITE GEOLOGY

The site is located in an area of sedimentary clay.

6. SOIL CONDITIONS

The soil profile and condition in each borehole are described on the Engineering Logs attached.

Are You Searching Answer of this Question? Request Australian Writers to Write a plagiarism Free Copy for You.

Get Help By Expert

Are you not able to choose the best company for your Initial planning case study work? Australia Assignment Help is one of the famous assignment writing organizations that offer premium quality Queensland university assignment help to students at a very affordable price.